October 19 - October 23, 2009: Third Floor cement Pour



A cement mixer along with a 45 meter Pump Truck was used to
pour the cement for the third floor.


The strutural slab ready for the cement pour.


The construction crews preparing the concrete finish with hand and
gas powered Trowel